Underground metro station design coordination

Design coordination for underground metro stations. From concept to construction-ready delivery.

Aligning architecture, engineering, and operations for underground metro stations — spatial concept work, BIM coordination, and construction-ready documentation, joining your design team alongside local licensed partners.

15 yrsArchitecture, overall
8 yrsUnderground metro station design
4 yrsHead of Architecture Department
5 yrsBIM software development, Revit API / C#
Underground metro station cross-section diagram Technical section drawing showing a typical island platform station: concourse level at grade, platform level below, and twin tunnel bores at track level, with level datums and a dimension line. GL ±0.00 CONCOURSE LEVEL RL -8.40 PLATFORM LEVEL RL -14.20 TB-01 TB-02 22.00 m SECTION A—A · TYPICAL ISLAND PLATFORM
DWG 001
REV A
Positioning

A design coordination specialist for underground metro stations — aligning architecture, engineering, and operations from early concept through BIM-coordinated, construction-ready delivery. Currently seeking cross-border work in Europe, alongside local licensed partners for compliance and submission.

UA / EN / PL
Working languages
7 markets
Currently seeking work
Concept → Coordination
Scope of engagement
DWG 002
REV A
What I Do

Services

Concept-stage through coordinated, approval-ready design development.
01

Multidisciplinary design coordination

Architecture aligned with structure, MEP, systems, and operations across the full design team.

02

BIM coordination and digital delivery

Model-based coordination and clash resolution, informed by direct software development experience — Revit API, C#.

03

Station concept design

Spatial logic for underground stations — box geometry, level relationships, circulation, and passenger flow from first principles.

04

Layout and spatial planning

Platform, concourse, and interchange arrangements resolved against structural, systems, and operational constraints.

05

Early-stage feasibility support

Testing station concepts against site constraints, alignment options, and constructability before design commitments are made.

06

Approval-oriented design development

Documentation structured for formal review and expertise processes, drawing on direct experience with government approval bodies.

07

Constructability and review optimization

Design refinement for buildability, sequencing, and clarity under stakeholder and contractor scrutiny.

08

Local partner collaboration

Structured handover to licensed local professionals for code compliance and formal submission in each jurisdiction.

DWG 003
REV A
Background

Coordination, under real delivery pressure.

Eight years working on underground metro stations, including the Vynohradar extension of the Kyiv Metro — four of those as Head of Architecture Department, where coordinating architecture, structure, systems, and operations across a live design team was the daily work, not a side task. Followed by five years as a BIM software developer — Revit API, C# — building the coordination tools other architects only use.

That combination — leading multidisciplinary coordination on a live metro project, then building the software that supports it — is uncommon, and it's the reason to bring in a coordination specialist rather than leave that work to whoever has time for it on a generalist team.

Coordination under real delivery pressure

Four years directing how architecture, structure, MEP, and operations resolved against each other on a live underground station project.

A developer's view of BIM

Five years building BIM software — Revit API, C# — bringing a working understanding of model structure, not just model use.

Underground station domain depth

Eight years concentrated specifically on the constraints of underground stations, where coordination failures are expensive and hard to reverse.

Approval-process fluency

Direct experience navigating formal government expertise and approval bodies — understanding what a coordinated package needs to contain.

DWG 004
REV A
Timeline

Where the experience comes from.

Before university
Grew up around architecture — my father practiced it, and I was around the work before I studied it formally.
15 years
Architecture, overall — general practice, starting before formal study.
8 of those years
Underground metro station design, including the Vynohradar extension of the Kyiv Metro.
4 of those years
Head of Architecture Department, leading the station design team.
Following that, 5 years
BIM software development — Revit API, C# — in the AEC sector.

My work has been concentrated in one hard problem: the architecture of underground metro stations, where spatial planning, structure, systems, and passenger operations all have to resolve in a fixed, unforgiving volume.

I'm now bringing that experience to cross-border projects in Europe — not as a local code authority, but as an early-phase specialist who shapes the architecture and works alongside licensed local professionals for compliance and submission.

— Yaroslav Levandovskyi
DWG 005
REV A
Process

How an engagement runs.

01

Understand goals and constraints

Alignment, site, operational requirements, and stakeholder expectations, established before any concept work begins.

02

Develop concept alternatives

Multiple spatial strategies tested against passenger flow, structure, and constructability, not a single fixed proposal.

03

Align architecture, engineering, and operations

The chosen concept is stress-tested with structural, systems, and operational stakeholders before it is locked in.

04

Coordinate BIM and design interfaces

Model-based coordination across disciplines, resolving interfaces before they become site problems.

05

Support approval and refinement with local partners

Documentation and design intent handed to licensed local professionals for code compliance, submission, and formal approval.

DWG 006
REV A
Markets

Currently seeking work in.

Poland
Ireland
Sweden
Netherlands
Norway
Denmark
England

These markets combine active or planned metro investment with English as a viable working language for early-stage design consultancy.

I'm building relationships here now, working alongside local licensed partners who handle jurisdiction-specific compliance.

DWG 007
REV A
Collaboration Model

How I work with your team.

What I bring

Multidisciplinary design coordination and BIM delivery for underground metro stations — aligning architecture, structure, MEP, and operations into a single coordinated package ready for tender, approval submission, or handover.

What stays with local partners

Code compliance, technical certification, and formal regulatory submission — work that requires in-country licensing I don't hold and don't claim to.

How I typically join

As a specialist joining an existing design team or contractor's project, rather than leading a project independently — brought in for the station's concept and coordination phase.

DWG 008
REV A

Let's discuss your underground station project.

Whether you're assembling a tender-stage team, shaping an early concept, or need coordination support on a live design package — a first conversation costs nothing to arrange.

Based in
Europe · working across time zones
Languages
Ukrainian, English, Polish